RIC-Orange Street  Bridge Replacement Project

RIC-Orange Street Bridge Replacement Project

RIC-Orange Street LPA Bridge Replacement ProjectThis project involved upgrading 186’ of Orange Street by replacement of the existing box beam bridge with a 93’ long single span composite steel beam bridge including approach reconstruction. Design services included...
LOR-2-8.59 State Bridge Rehabilitation Project

LOR-2-8.59 State Bridge Rehabilitation Project

LOR-2-8.59 State Bridge ReplacementThis Shaffer Pomeroy project involved improving 400’ of Oberlin Road in Amherst Township including rehabilitating a four span steel beam bridge over S.R.2. The existing superstructure was removed and replaced with new continuous...
SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge Rehabilitation/ReplacementThis project for ODOT District 4, completed in 2005, was composed of five bridges at three sites involving engineering and surveying services for the design of bridges, roadway resurfacing, approaches...
RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge ReplacementThis Shaffer Pomeroy project involved improving 173’ of U.S.R.42 by the part-width replacement of the existing three-span concrete slab bridge over a branch of Cedar Fork two miles southwest of Lexington with a new 40’ wide, 99’...