Milltown Road/Melrose Drive Roadway Reconstruction Design

, , ,
Milltown Road/Melrose Drive Roadway Reconstruction Design

This project involved reconstruction of 0.73 mile of Milltown Road from Cleveland Avenue to Melrose Drive and 0.24 mile of Melrose Drive all in the City of Wooster. Design services included surveying and engineering for the preparation of roadway construction plans including storm sewer design, a project site plan, maintenance of traffic plans to allow for part-width construction and right of way plans.

Also included in the design of this project was the rehabilitation of the existing substructure of the bridge carrying Milltown Road over Little Apple Creek to accommodate a 7.5 ft. wide by 64 ft. long prefabricated pedestrian bridge including all necessary specifications.
Estimated construction cost is $1.4 million.
Client: City of Wooster, 2005. (SJL Project)

 