RIC-Hollywood Lane, Municipal Storm Sewer Culvert Replacement Design Project

The RIC-Hollywood Lane, Municipal Storm Sewer Culvert Replacement Design Project involved surveying and engineering for the removal and replacement of 211’ of existing 60” diameter corrugated steel culvert pipe, 68’ of existing storm sewer, 171 sq. ft. of sidewalk, 52 sq. yds. of asphalt pavement, 38’ of guardrail, one manhole and two catch basins with 211’ of new 60” corrugated plastic pipe with full-height reinforced concrete headwalls, wingwalls and footings, 53’ of storm sewer, 132 sq. ft. of sidewalk, 52 sq. yds. of concrete pavement and one manhole. Traffic will be detoured on adjacent local streets for 30 days. Plans were completed in four and one-half months.

The estimated construction cost is $230,200.

Client: City of Mansfield, 2021.