RIC-42-1.02 State Bridge Replacement
This Shaffer Pomeroy project involved improving 173’ of U.S.R.42 by the part-width replacement of the existing three-span concrete slab bridge over a branch of Cedar Fork two miles southwest of Lexington with a new 40’ wide, 99’ long three-span (30’-0”, 37’-6”, 30’-0”) continuous reinforced concrete slab on pile-supported integral abutments and capped-pile piers including approach slabs. Design services included surveying and engineering for the preparation of bridge and roadway construction plans including maintenance of traffic, a project site plan, drainage design and right of way plans. Pomeroy & Associates provided bridge design checking services.
Project estimated construction cost is $652,929.
Client: ODOT District 3, 2013.