RIC-42-1.02 State Bridge Replacement Project

, ,
RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02

RIC-42-1.02

involved improving 173’ of U.S.R.42 over a branch of Cedar Fork in Troy Township including the replacement of a 40’ wide, 3 span continuous concrete slab with another one of the same width, span lengths of 30’-0”, 37’-6” and 30’-0″. Abutments and capped pile piers are supported by 12” and 16” pipe piles respectively. The existing bridge was replaced in stages by using part-width construction. Traffic was maintained by keeping one lane open at all times using signalization.
Project estimated construction cost was $653,000.

Client: ODOT  District 3, 2013.