SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge Rehabilitation/ReplacementThis project for ODOT District 4, completed in 2005, was composed of five bridges at three sites involving engineering and surveying services for the design of bridges, roadway resurfacing, approaches...
SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehabilitation This project for ODOT District 4 involved the rehabilitation of two four span steel beam bridges: SUM-21-0260 (span lengths: 37’-3”, 2 @ 60’-8”, 37’-3”) which carries Greenwich Road over S.R.21 and SUM-21-0462 (span...
ASD-42-3.57 State Bridge Rehabilitation Project

ASD-42-3.57 State Bridge Rehabilitation Project

ASD-42-3.57 State Bridge Rehabilitation ProjectThe bridge is located on U.S.R.42 over Claremont Avenue in the City of Ashland in Ashland County.  Provided engineering and surveying services concerning maintenance of traffic, roadway widening and bridge rehabilitation...
RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge ReplacementThis Shaffer Pomeroy project involved improving 173’ of U.S.R.42 by the part-width replacement of the existing three-span concrete slab bridge over a branch of Cedar Fork two miles southwest of Lexington with a new 40’ wide, 99’...