


PIC-104-8.92 State Bridge Rehabilitation
PIC-104-8.92 State Bridge RehabilitationThis Shaffer Pomeroy project included surveying and engineering design for this 265’ long project including rehabilitation of a five-span (34’-0”, 3 spans @ 42’-6”, 34’-0”) continuous reinforced concrete slab bridge with capped...
WAY-226-1.80 State Bridge Replacement Project
WAY-226-1.80 State Bridge Replacement ProjectThis project involved improving 150’ of S.R. 226 in the Village of Shreve by replacement of an existing single span steel beam bridge with a 45’ span non-composite concrete box beam bridge including approach reconstruction....
MRW-19-5.72 State Bridge Replacement
MRW-19-5.72 State Bridge ReplacementThis Shaffer Pomeroy project involved upgrading 180’ of S.R. 19 by replacement of the existing structure including approach reconstruction. Our services included surveying and engineering for the preparation of roadway construction...