WAY-226-1.80 State Bridge Replacement Project

This project involved improving 150’ of S.R. 226 in the Village of Shreve by replacement of an existing single span steel beam bridge with a 45’ span non-composite concrete box beam bridge including approach reconstruction. Design services included surveying and engineering for the preparation of roadway construction plans including preparation of a project site plan, drive approach reconstruction, bridge details, and a right of way plan. Project estimated construction cost was $290,820.

Client: ODOT District 3, 2004, updated 2008.