LOR-2-8.59 State Bridge Rehabilitation Project

LOR-2-8.59 State Bridge Rehabilitation Project

LOR-2-8.59 State Bridge ReplacementThis Shaffer Pomeroy project involved improving 400’ of Oberlin Road in Amherst Township including rehabilitating a four span steel beam bridge over S.R.2. The existing superstructure was removed and replaced with new continuous...
SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge

SUM-21-(5.69)(7.58)(7.78) State Bridge Rehabilitation/ReplacementThis project for ODOT District 4, completed in 2005, was composed of five bridges at three sites involving engineering and surveying services for the design of bridges, roadway resurfacing, approaches...
SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehabilitation This project for ODOT District 4 involved the rehabilitation of two four span steel beam bridges: SUM-21-0260 (span lengths: 37’-3”, 2 @ 60’-8”, 37’-3”) which carries Greenwich Road over S.R.21 and SUM-21-0462 (span...
Technology Park

Technology Park

Technology Park Commercial & Residential SubdivisionThis Commercial & Residential Subdivision project in the City of Shelby involved surveying and engineering design services for the completion of construction plans for the development of an entire commercial...
RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge Replacement Project

RIC-42-1.02 State Bridge ReplacementThis Shaffer Pomeroy project involved improving 173’ of U.S.R.42 by the part-width replacement of the existing three-span concrete slab bridge over a branch of Cedar Fork two miles southwest of Lexington with a new 40’ wide, 99’...