MED-94-(12.000)(12.640)(13.020) State Roadway Resurfacing, Culvert & Bridge Replacement
MED-94-(12.000)(12.640)(13.020) State Roadway Resurfacing, Culvert & Bridge ReplacementThis metric project located on S.R.94 in Medina County included engineering and surveying services for a 1,050’ roadway widening and resurfacing project that included culvert...
HUR-60-2.82 State Bridge Replacement
HUR-60-2.82 State Bridge Replacement Project located on S.R.60 over a tributary of the East Branch of the Vermillion River in Huron County. Provided engineering and surveying services concerning road widening, right-of-way and bridge replacement for a 55’ long...
MRW-19-5.72 State Bridge Replacement
MRW-19-5.72 State Bridge ReplacementThis Shaffer Pomeroy project involved upgrading 180’ of S.R. 19 by replacement of the existing structure including approach reconstruction. Our services included surveying and engineering for the preparation of roadway construction...