Heartland Trail, Phase 3

Heartland Trail, Phase 3

Heartland Trail, Phase 3 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 1,400’ long project, including a 10’ wide, concrete multi-use trail in Orrville. Our work involved design of the...
Heartland Trail, Phase 2

Heartland Trail, Phase 2

Heartland Trail, Phase 2 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 1.0-mile-long project, including a 10’ wide, multi-use trailwith an asphalt wearing course in Orrville. Our work...
Heartland Trail, Phase 1

Heartland Trail, Phase 1

Heartland Trail, Phase 1 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 2.4-mile-long, 10’ wide, trail with an asphalt wearing course from Orrville to Marshallville in Wayne County. Our...
WAY-241-0.02 State Bridge Replacement

WAY-241-0.02 State Bridge Replacement

WAY-241-0.02 State Bridge ReplacementProject located on S.R.241 over the West Branch of Crabapple Creek in Wayne County.  Provided engineering and surveying services concerning road reconstruction, right-of-way and bridge replacement for a 150’ long project.  Designed...
WAY-241-0.02 State Bridge Replacement

WAY-83-(0.62)(0.74) State Bridge Replacements

WAY-83-(0.62)(0.74) State Bridge Replacements: This Shaffer Pomeroy project improved 120’ of S.R.83 (Millersburg Road) over two tributaries to Savage Run in Franklin Township of Wayne County. The roadway curves 12°-21’ to the west over the north Savage Run tributary....