ASD-302-0.89 State Bridge Replacement

ASD-302-0.89 State Bridge Replacement

ASD-302-0.89 State Bridge ReplacementProject located on S.R.302 over Muddy Fork east of Red Haw in Ashland County. Provided engineering and surveying services for roadway widening and bridge replacement for a 295’ long project. Designed roadway approaches and 84’-3”...
HUR-60-2.82 State Bridge Replacement

HUR-60-2.82 State Bridge Replacement

HUR-60-2.82 State Bridge Replacement Project located on S.R.60 over a tributary of the East Branch of the Vermillion River in Huron County. Provided engineering and surveying services concerning road widening, right-of-way and bridge replacement for a 55’ long...
PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge RehabilitationThis Shaffer Pomeroy project included surveying and engineering design for this 265’ long project including rehabilitation of a five-span (34’-0”, 3 spans @ 42’-6”, 34’-0”) continuous reinforced concrete slab bridge with capped...
BEL-70-18.43 State Bridge Rehabilitation Project

BEL-70-18.43 State Bridge Rehabilitation Project

BEL-70-18.43 State Bridge Rehabilitation: This Shaffer Pomeroy project improved 572’ of C.R.4 (Clark Road) over I.R.70 on the south edge of St. Clairsville in Belmont County. The project included replacing the existing continuous non-composite steel beam...