SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehab

SUM-21-(2.60)(4.62) State Bridge Rehabilitation This project for ODOT District 4 involved the rehabilitation of two four span steel beam bridges: SUM-21-0260 (span lengths: 37’-3”, 2 @ 60’-8”, 37’-3”) which carries Greenwich Road over S.R.21 and SUM-21-0462 (span...