HUR-250-5.26 State Bridge Replacement

HUR-250-5.26 State Bridge Replacement

HUR-250-5.26 State Bridge ReplacementProject located on U.S.R.250 over a tributary of Norwalk Creek in Huron County. Provided engineering and surveying services for roadway widening, right-of-way and bridge replacement for a 115’ long project. Prepared the design for...
ASD-89-(8.48)(8.77) State Bridge Replacement

ASD-89-(8.48)(8.77) State Bridge Replacement

ASD-89-(8.48)(8.77) State Bridge ReplacementProject located on S.R.89 over the Austin Run and Drushel Run, respectively, in Ashland County.  Provided engineering and surveying services concerning road widening and bridge replacement for a 1,475’ long project. ...
ASD-302-0.89 State Bridge Replacement

ASD-302-0.89 State Bridge Replacement

ASD-302-0.89 State Bridge ReplacementProject located on S.R.302 over Muddy Fork east of Red Haw in Ashland County. Provided engineering and surveying services for roadway widening and bridge replacement for a 295’ long project. Designed roadway approaches and 84’-3”...
HUR-60-2.82 State Bridge Replacement

HUR-60-2.82 State Bridge Replacement

HUR-60-2.82 State Bridge Replacement Project located on S.R.60 over a tributary of the East Branch of the Vermillion River in Huron County. Provided engineering and surveying services concerning road widening, right-of-way and bridge replacement for a 55’ long...
PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge RehabilitationThis Shaffer Pomeroy project included surveying and engineering design for this 265’ long project including rehabilitation of a five-span (34’-0”, 3 spans @ 42’-6”, 34’-0”) continuous reinforced concrete slab bridge with capped...