WAY-83-(0.62)(0.74) State Bridge Replacements The WAY-83-(0.62)(0.74) State Bridge Replacements: This Shaffer Pomeroy project improved 120’ of S.R.83 (Millersburg Road) over two tributaries to Savage Run in Franklin Township of Wayne County. The roadway curves...
ERI-269-12.72 State Bridge ReplacementProject located on S.R.269 over Sandusky Bay in Erie County. Provided engineering and surveying services concerning roadway planning and resurfacing and bridge replacement for a 7,090’ long project. Designed a 70’ long precast...
ERI-6-24.23 State Bridge ReplacementProject located on U.S.R.6 over Chappel Creek in Erie County. Provided engineering and surveying services for roadway widening, right-of-way and bridge replacement for a 625’ long project. Prepared the design for a curved 123’...
HUR-162-24.17 State Bridge Replacement ProjectThis project is located on S.R.162 (West Main Street) over a tributary to the East Branch of the Vermilion River in New London. Provided engineering and surveying services for approach roadway and 12’-5” span x 5’-9” rise...
RIC-603-11.800 State Bridge ReplacementMetric project located on S.R.603 over Whetstone Creek in Olivesburg in Richland County. Provided engineering and surveying services for curved roadway approach design and bridge replacement for a 164’ (50 m) long project....