HUR-162-24.17 State Bridge Replacement Project

This project is located on S.R.162 (West Main Street) over a tributary to the East Branch of the Vermilion River in New London. Provided engineering and surveying services for approach roadway and 12’-5” span x 5’-9” rise x 54’ long curved cast-in-place three-sided flat-top concrete box culvert placed between Wheeling & Lake Erie and Conrail Railroad tracks. Project estimated construction cost was $123,655.

Client: ODOT District 3, 1994.