HUR-C.R.11-3.41, Design-Build Bridge Replacement Project

HUR-C.R.11-3.41, Design-Build Bridge Replacement Project

HUR-C.R.11-3.41, Design-Build Bridge Replacement Project This project involved improving 341’ of Base Line Road or East Main Street by the replacement of the existing single-span steel pony truss bridge over the West Branch of the Huron River on the east side of...
ASD-250-23.45 State Bridge Rehabilitation

ASD-250-23.45 State Bridge Rehabilitation

ASD-250-23.45 State Bridge RehabilitationProject located on U.S.R.250 over Muddy Fork east of Rowsburg in Ashland County. Provided engineering and surveying services for roadway improvement and bridge rehabilitation for a 245’ long project. Designed roadway approaches...
PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge Rehabilitation

PIC-104-8.92 State Bridge RehabilitationThis Shaffer Pomeroy project included surveying and engineering design for this 265’ long project including rehabilitation of a five-span (34’-0”, 3 spans @ 42’-6”, 34’-0”) continuous reinforced concrete slab bridge with capped...
PIC-104-8.92 State Bridge Rehabilitation

MOT-70-2.95 State Bridge Rehabilitation

MOT-70-2.95 State Bridge Rehabilitation This Shaffer Pomeroy project involved contra-flow maintenance of traffic for the removal of the existing latex concrete (westbound bridge) and asphalt concrete (eastbound bridge) overlays with micro-silica concrete overlays,...
BEL-70-18.43 State Bridge Rehabilitation Project

BEL-70-18.43 State Bridge Rehabilitation Project

BEL-70-18.43 State Bridge Rehabilitation: This Shaffer Pomeroy project improved 572’ of C.R.4 (Clark Road) over I.R.70 on the south edge of St. Clairsville in Belmont County. The project included replacing the existing continuous non-composite steel beam...