HOL-North Mad Anthony Street, Municipal Culvert Rehabilitation Project
HOL-North Mad Anthony Street, Municipal Culvert Rehabilitation Project The HOL-North Mad Anthony Street, Municipal Culvert Rehabilitation Project relocated and replaced approximately 44’ of existing 4’ span x 3’ rise reinforced concrete and stone pipe arch with 60’ of...
RIC-Hollywood Lane, Municipal Storm Sewer Culvert Replacement Design Project
RIC-Hollywood Lane, Municipal Storm Sewer Culvert Replacement Design Project The RIC-Hollywood Lane, Municipal Storm Sewer Culvert Replacement Design Project involved surveying and engineering for the removal and replacement of 211’ of existing 60” diameter corrugated...
RIC-C.R.134-4.75 (Cook Road Sidewalks)
RIC-C.R.134-4.75 (Cook Road Sidewalks) This LPA Municipal Sidewalk Design Project involved surveying and engineering for the removal of 910’ of guardrail, 51’ of concrete curb and 235 sq. yds. of existing asphalt pavement along Cook Road; 131 sq. ft. of sidewalk along...