RIC-C.R.134-4.75 (Cook Road Sidewalks)

RIC-C.R.134-4.75 (Cook Road Sidewalks)

RIC-C.R.134-4.75 (Cook Road Sidewalks) This LPA Municipal Sidewalk Design Project involved surveying and engineering for the removal of 910’ of guardrail, 51’ of concrete curb and 235 sq. yds. of existing asphalt pavement along Cook Road; 131 sq. ft. of sidewalk along...
Heartland Trail, Phase 3

Heartland Trail, Phase 3

Heartland Trail, Phase 3 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 1,400’ long project, including a 10’ wide, concrete multi-use trail in Orrville. Our work involved design of the...
Heartland Trail, Phase 2

Heartland Trail, Phase 2

Heartland Trail, Phase 2 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 1.0-mile-long project, including a 10’ wide, multi-use trailwith an asphalt wearing course in Orrville. Our work...
Heartland Trail, Phase 1

Heartland Trail, Phase 1

Heartland Trail, Phase 1 This Multi-Use Path Project involved surveying and engineering services for the design and preparation of detailed plans for a 2.4-mile-long, 10’ wide, trail with an asphalt wearing course from Orrville to Marshallville in Wayne County. Our...
ASD-Ford Drive, City of Ashland Roadway Construction Project

ASD-Ford Drive, City of Ashland Roadway Construction Project

ASD-Ford Drive, City of Ashland Roadway Construction ProjectThis project involved construction of 1,575’ of a 24’ wide roadway on a new alignment and profile grade, terminating at a proposed cul-de-sac.  Design services included surveying and engineering for the...