HUR-C.R.11-3.41, Design-Build Bridge Replacement Project This project involved improving 341’ of Base Line Road or East Main Street by the replacement of the existing single-span steel pony truss bridge over the West Branch of the Huron River on the east side of...
HUR-T.R.76-4.50, Design-Build Bridge Replacement Project This project involved improving 510’ of Rome Greenwich Road by the replacement of the existing single-span steel pony truss bridge over the Southwest Branch of the Vermilion River in Greenwich Township with a...
MRW-C.R.15-5.01 Design-Build Bridge Replacement Project The MRW-C.R.15-5.01 Design-Build Bridge Replacement Project improved 1,217’ ofWest Liberty-Mount Vernon Road (C.R.15) over Big Walnut Creek south of Marengo in Morrow County. This project replaced the existing...
WAY-83-(0.62)(0.74) State Bridge Replacements The WAY-83-(0.62)(0.74) State Bridge Replacements: This Shaffer Pomeroy project improved 120’ of S.R.83 (Millersburg Road) over two tributaries to Savage Run in Franklin Township of Wayne County. The roadway curves...
HOL-North Mad Anthony Street, Municipal Culvert Rehabilitation Project The HOL-North Mad Anthony Street, Municipal Culvert Rehabilitation Project relocated and replaced approximately 44’ of existing 4’ span x 3’ rise reinforced concrete and stone pipe arch with 60’ of...