RIC-T.R.1349-0.12 Washington Township Culvert Replacement Project
SJL replaced the existing corrugated steel pipe culvert carrying Lexview Circle over a tributary of the Clear Fork of the Mohican River with 130’ of 60” diameter corrugated plastic pipe skewed approximately 26° left forward with half-height reinforced concrete headwalls at each end. Township crew repaved the affected portion of the roadway.
The estimated construction cost was $43,130.
Client: Washington Twp., Richland County, 2014