LOR-Park Street LPA Municipal Bridge Replacement
This project involved upgrading 125’ of Park Street by replacement of the existing precast concrete “T” beam bridge with a 25’ span x 10’ rise x 37’ long flat-topped three-sided culvert including approach reconstruction. Design services included surveying and engineering for the preparation of roadway construction plans including a project site plan, water line relocation, sanitary sewer relocation, storm sewer design, and right of way plans. Decorative railings were designed for this project to match other existing railings within the City and the exposed portions of the headwalls and wingwalls used a stone pattern form liner to meet the City’s aesthetic requirements.
Project construction cost was $404,325.
Client: City of Oberlin, 2011.