CRA-Patterson Street LPA Municipal Bridge Replacement Project
This project involved upgrading 93’ of Patterson Street by replacement of the existing bridge with a 51’-9” long (c/c brgs.), 30’ wide (f/f guardrails) noncomposite precast concrete box beam bridge with pile-supported concrete stub abutments including approach reconstruction. Design services included surveying and engineering for the preparation of roadway construction plans including a temporary 352’ long, 16’ wide road for maintaining traffic, 165’ water line relocation, right of way plans, and preparation of the PS&E package.
Project estimated construction cost was $324,317.
Client: Village of Crestline, 2014.