ASD-Ford Drive, City of Ashland Roadway Construction Project
This project involved construction of 1,575’ of a 24’ wide roadway on a new alignment and profile grade, terminating at a proposed cul-de-sac. Design services included surveying and engineering for the preparation of roadway construction plans including a project site plan, drainage design, intersection design, and traffic control.
Project estimated construction cost was $385,780
Client: City of Ashland, 2007.